Change search
Refine search result
1 - 10 of 10
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Rows per page
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sort
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
Select
The maximal number of hits you can export is 250. When you want to export more records please use the Create feeds function.
  • 1.
    Carlsson, Bengt
    et al.
    SMHI, Research Department, Hydrology.
    Sanner, Håkan
    SMHI, Core Services.
    Influence of river regulation on runoff to the Gulf of Bothnia: Gulf of Bothnia Year 19911994Report (Other academic)
    Download full text (pdf)
    fulltext
  • 2.
    Granström, Carl
    et al.
    SMHI.
    Sanner, Håkan
    SMHI, Core Services.
    Utvärdering av SMHIs prognos-och varningstjänsts verksamhet under flödet i området runt Emån juli 20032003Report (Other academic)
    Abstract [sv]

    Rapporten är en utvärdering av SMHI:s hydrologiska prognos- och varningstjänsts arbete juli 2003 i samband med kraftiga regn och mycket/extremt högt flöde i området runt Emån. I dokumentet beskrivs även den hydrologiska situationen för den aktuella tiden.Med hjälp av observationer i realtid, meteorologiska prognoser, hydrologiska prognoser, visualiseringsverktyg och ett nära samarbete med kraftbolagen är SMHI:s hydrologiska prognos- och varningstjänst kontinuerligt uppdaterad på det hydrologiska läget i hela Sverige. När sannolikheten bedöms vara större än 50 % för att en varningsnivå överskrids skall en varning utfärdas. Under mycket höga flöden skall SMHI också stötta länsstyrelse och räddningstjänst med meteorologisk och hydrologisk expertis samt med specialanpassade prognoser.Ett ovanligt torrt sista halvår 2002 följdes av en torr vårvinter, men trenden bröts under april 2003. April t.o.m juni var nederbördsrikare än normalt och följdes den 1 till 6 juli av ett kraftigt regnväder som gav mer än 80 mm regn i större delen av Småland och i sydligaste Östergötland. Stora delar av området fick mer än 120 mm och lokalt föll upp emot 190 mm, vilket ledde till flöden i Brusaån motsvarande ca 60 års återkomsttid. Längre nedströms i Emån dämpades flödet och återkomsttiden var där mellan 5 och 10 år.Ett viktigt underlag för flödesvarningar är dagliga automatiska flödesprognoser för utvalda avrinningsområden över hela Sverige. Ett sådant avrinningsområde är Brusafors som ligger centralt i det värst drabbade området. Nederbördsmängdernas stora lokala variationer kunde inte fångas upp av SMHIs relativt glesa nät av realtidsrapporterande nederbördsobservationer. Därför fick observerad nederbörd ökas med 40 % för att beräknad och observerad flödesvolym skulle stämma i Brusafors. Manuella specialprognoser för räddningstjänsten har också gjorts för vattenståndet i sjön Hulingen och för flödet i Blankaström.SMHI har under perioden skickat ut sju flödesvarningar och en hydrologisk information. Varningarnas träffsäkerhet var 92 %, vilket är mycket bra. Tyvärr kom inte SMHIs första varning fram till alla räddningstjänster, vilket ökade överraskningseffekten och försvårade räddningstjänstens kontakt med SMHI. Nuvarande första kontaktväg mellan SMHI och räddningstjänsten går via länsstyrelsen, vilket kräver att hela kedjan fungerar. En enkät skickades ut till de kommuner, länsstyrelser och kraftbolag som berördes av varningarna. En sammanställning av enkätsvaren och samtliga kommentarer redovisas i denna rapport. Det övergripande omdömet om SMHI:s tjänster var gott.

    Download full text (pdf)
    FULLTEXT01
  • 3.
    Johansson, Barbro
    et al.
    SMHI, Professional Services.
    Lindström, Göran
    SMHI, Research Department, Hydrology.
    Olsson, Jonas
    SMHI, Research Department, Hydrology.
    Yacoub, Tahsin
    SMHI, Core Services.
    Haase, Günther
    SMHI, Research Department, Atmospheric remote sensing.
    Jacobsson, Karin
    SMHI, Professional Services.
    Sanner, Håkan
    SMHI, Core Services.
    Översvämningsprognoser i områden med ofullständiga data: Metodutveckling och utvärdering2007Report (Other academic)
    Abstract [sv]

    Rapporten redovisar slutresultat från projektet ”Översvämningsprognoser Utveckling av metoder för ett rikstäckande system för vattenförings- och vattenståndsprognoser”. Projektet har i huvudsak varit finansierat av Räddningsverket, numera MSB, (Myndigheten för Samhällsskydd och Beredskap), men har även utnyttjat resultat från näraliggande projekt finansierade av Elforsk, SMHI och EU.I ett rikstäckande system måste prognoser göras för vattendrag där det saknas detaljerad information om avrinningsområdets och älvfårans egenskaper. Modeller kan inte tillämpas och verifieras på samma sätt som i områden med god datatillgång och tillgång till tidsserier med observerad vattenföring. Eftersom beräkningarna inte kan verifieras mot observationer blir det extra viktigt med bra nederbördsinformation och att kunna ge ett mått på osäkerheten i prognosen. Projektet har dels arbetat med metodutveckling, dels med en omfattande utvärdering av data och beräkningsresultat. En pilotstudie gjordes för flödet sommaren 2004 i Lagan/Ljungby. Fokus har varit på följande områden:- Utveckling och utvärdering av en metodik för att utnyttja meteorologiska och hydrologiska sannolikhetsprognoser- Utvärdering och minimering av osäkerheten i hydrologiska (vattenföring) och hydrauliska (vattenstånd) prognosmodeller.- Utveckling och utvärdering av metoder för att utnyttja radarobservationer av nederbörd.Projektet har visat att det är möjligt att göra vattenståndsprognoser med rimlig noggrannhet, utgående från data som finns tillgängliga i ett rikstäckande system. Tillgång till bra nederbördsinformation för dagarna före prognosen är viktig, speciellt i sjörika system med ett långsamt förlopp. För att kunna göra sannolikhetsprognoser räcker det inte att ta hänsyn till osäkerheten i den meteorologiska prognosen genom att direkt utnyttja meteorologiska ensembleprognoser. Spridningen i de meteorologiska nederbördsprognoserna är inte tillräcklig och osäkerheten i den hydrologiska modellen måste beaktas.De projektresultat som inom det närmaste året kommer att utnyttjas i ett rikstäckande system är de som är relaterade till hydrologisk modellering och sannolikhetsprognoser. Arbetet med att utveckla metoder för att utnyttja radarinformation i operationell skattning av arealnederbörd fortgår. Fallstudier har visat att vattenståndsprognoser kan göras med modeller baserad på översiktlig information om topografi och tvärsektioner i vattendragen. Däremot är det tidsödande att sätta upp en hydraulisk modell för en godtycklig älvsträcka. Tills vidare är det realistiskt att anta att vattenståndsprognoser främst kommer att göras i vattendrag som ingått i den översiktliga översvämningskarteringen.

    Download full text (pdf)
    FULLTEXT01
  • 4.
    Lindell, Sten
    et al.
    SMHI, Professional Services.
    Carlsson, Bengt
    SMHI, Research Department, Hydrology.
    Sanner, Håkan
    SMHI, Core Services.
    Reihan, Alvina
    SMHI.
    Vedom, Rimma
    Application of the integrated hydrological modelling system IHMS-HBV to pilot basin in Estonia1996Report (Other academic)
    Abstract [en]

    This report describes calibration and application of the IHMS-HBV model on a daily time step to Kasari River basin in Estonia. The Swedish Meteorological and Hydrological Institute (SMHI) have as consultant been responsible for the set-up, calibration, training and delivery of the Integrated Hydrological Model System with the HBV-model (IHMSHBV). The Swedish Board for lnvestment and Technical Support (BITS) financed the project. The training and transfer of technology were addressed to the Estonian Meteorological and Hydrological Institute (EMHI).

    Download full text (pdf)
    fulltext
  • 5.
    Lindell, Sten
    et al.
    SMHI, Professional Services.
    Ericsson, Lars O.
    SMHI.
    Sanner, Håkan
    SMHI, Core Services.
    Göransson, Karin
    SMHI.
    Integrated Hydrological Monitoring and Forecasting System for the Vistula River Basin1997Report (Other academic)
    Abstract [en]

    This report is a technical description on the project Integrated Hydrological Monitoring and Forecasting System for the Vistula River Basin. The Swedish Meteorological and Hydrological lnstitute in Nonköping, Sweden, (hereinafter called SMHI) and Institute of Meteorology and Water Management in Warsaw, Poland, (hereinafter called IMWM) has fulfilled and co-operated in this project. SMHI have as consultants been responsible for design and development of the Vistula River Monitoring and Forecasting System, for on-the-job training and education in Windows programming and development as well as in set-up, calibration and applications of the HBV-model. IMWM responsibilities has been to provide the project with hydrometeorological data and information on land use for the calibration activities and to supply the project with the hydrodynamic model in use at the polish institute. IMWM has been deeply involved in the design and development of the Vistula River Monitoring and Forecasting System and bad the main responsibility in the HBV-model calibration activities.

    Download full text (pdf)
    fulltext
  • 6.
    Lindell, Sten
    et al.
    SMHI, Professional Services.
    Sanner, Håkan
    SMHI, Core Services.
    Nikolushkina, Irena
    SMHI.
    Stikute, Inita
    SMHI.
    Application of the integrated hydrological modelling system IHMS-HBV to pilot basin in Latvia1996Report (Other academic)
    Abstract [en]

    This report describes calibration and application of the IHMS-HBV model on daily time step to Lielupe River basin in Latvia. The Swedish Meteorological and Hydrologicalnstitute (SMHI) have as consultant been responsible for the set-up, calibration, training and delivery of the Integrated Hydrological Model System with the HBV-model (IHMSHBV). The Swedish Board for Investment and Technical Support (BITS) financed the project. The training and transfer of technology were addressed to the Latvia Hydrometeorological Agency (LHMA)

    Download full text (pdf)
    fulltext
  • 7.
    Lärke, Agne
    et al.
    SMHI.
    Sanner, Håkan
    SMHI, Core Services.
    Johnell, Anna
    SMHI, Professional Services.
    Utvärdering av SMHIs prognos och varningstjänsts verksamhet under flödena januari t o m mars 2002 i sydvästra Sverige2003Report (Other academic)
    Abstract [sv]

    Mellan den 16 januari och 13 februari föll rikligt med regn över sydvästra Sverige. I kombination med viss snösmältning orsakade detta kraftigt stigande flöden och översvämningar som följd. Flödena kulminerade på många håll i början av februari. I slutet av februari och början av mars ökade återigen flödena kraftigt till följd av nya regnväder. På de flesta håll nåddes dock inte flöden lika höga som i början av februari.

    Download full text (pdf)
    FULLTEXT01
  • 8.
    Sanner, Håkan
    et al.
    SMHI, Core Services.
    Harlin, Joakim
    SMHI.
    Persson, Magnus
    SMHI.
    Application of the HBV model to the Upper Indus River for inflow forecasting to the Tarbela dam1994Report (Other academic)
    Abstract [en]

    This report describes the HBV model application for inflow forecasting on a daily time step to the Tarbela dam in the Indus River. The model application forms part of the new Tarbela control center for Pakistan's Water and Power Development Authority (W APDA). The new control system will be an ABB S.P.I.D.E.R. SCADA system, delivered on a turnkey basis by ABB Network  Control of Sweden. SMHI have as subconsultants to the ABB Network Control been responsible for the set up, calibration, training and delivery of the inflow forecasting system based on the HBV model.

    Download full text (pdf)
    fulltext
  • 9.
    Yacoub, Tahsin
    et al.
    SMHI, Core Services.
    Sanner, Håkan
    SMHI, Core Services.
    Vattenståndsprognoser baserade på översiktlig kartering: En fallstudie2006Report (Other academic)
    Abstract [sv]

    Räddningsverket,numera MSB, (Myndigheten för Samhällsskydd och Beredskap) finansierar forskningsprojektet ”Översvämningsprognoser - Utveckling av metoder för ett rikstäckande system” som bedrivs på SMHI. Den här rapporten redovisar resultaten från delprojektet ”Vattenståndsprognoser”. Projektet syfte har varit att i fallstudier utvärdera i vilka typer av vattendrag som översiktliga data ger en tillräcklig noggrannhet i prognosticerat vattenstånd. Fallstudier har genomförts för Byälven, Emån, Eskilstunaån och Lagan vid Ljungby. Ursprungligen var det tänkt att den geografiska spridningen skulle vara större, men tillgången på data har fått styra valet av områden. I Byälven och Emån har den hydrauliska modellen, som användes vid Räddningsverkets (numera MSB, Myndigheten för Samhällsskydd och Beredskap), översiktliga översvämningskartering, jämförts med observerade vattenstånd som inte använts vid kalibreringen. För Eskilstunaån och Lagan vid Ljungby har detaljerade hydrauliska modeller satts upp efter det att den översiktliga hydrauliska modellen gjordes. Dessa har här använts i stället för mätningar för att uppskatta vilken noggrannhet den översiktliga hydrauliska modellen ger och hur den skulle kunna förbättras under ett flöde genom korrigering/ uppdatering mot uppmätta värden.Resultaten visar att den översiktliga hydrauliska modellen oftast ger förvånansvärt bra noggrannhet, men stora fel kan finnas på enstaka platser. Brist på regleringsuppgifter och osäkerheter vattenföringsprognoser har oftast större betydelse för osäkerheten i vattenståndsprognoserna än brist i noggrannhet i den översiktliga hydrauliska modellen. De tankar som finns om att låta räddningstjänsten observera vattenstånd vid broar under ett flöde för att förbättra vattenståndsprognoserna får stöd av resultaten.

    Download full text (pdf)
    FULLTEXT01
  • 10.
    Yacoub, Tahsin
    et al.
    SMHI, Core Services.
    Westman, Ylva
    SMHI, Core Services.
    Sanner, Håkan
    SMHI, Core Services.
    Samuelsson, Bernth
    SMHI, Core Services.
    Detaljerad översvämningskarta för Eskilstunaån. Ett projekt inom KRIS-GIS2005Report (Other academic)
    Abstract [sv]

    SMHI har gjort en detaljerad översvämningskarta för en 23 km lång sträcka längs Eskilstunaån, från utloppet av Närsjöfjärden och ned till mynningen i Mälaren. Arbetet har drivits som ett projekt inom KRIS-GIS ® och finansierats till hälften av KBM (via Lantmäteriets Totalförsvarsenhet) och till häften av SMHI. En jämförelse mellan den framtagna detaljerade översvämningskarteringen och den av Räddningsverket (numera MSB, Myndigheten för Samhällsskydd och Beredskap) finansierade översiktliga översvämningskarteringen för Eskilstunaån har också genomförts. En laserskannad höjdmodell med hög noggrannhet har tagits fram och en ekolodning av Eskilstunaån har genomförts. Med bland annat detta underlagsmaterial har den detaljerade karteringen genomförts. De hydrauliska beräkningarna har förbättrats av den mer detaljerade höjddatabasen och djupmätningarna. Vattenståndsberäkningarna i den översiktliga översvämningskarteringen är oftast förvånansvärt bra, men stora fel kan finnas på kortare sträckor längs vattendraget. Det beror på och är beroende av mängden och kvalitén på extrainformationen som inhämtas, såsom broritningar, dammuppgifter, vattenståndsuppgifter från tidigare flöden och tidigare inventeringar. De översvämmade områdena skiljer relativt mycket mellan den detaljerade och den översiktliga översvämningskarteringen. Den huvudsakliga orsaken är skillnaden mellan höjddatabaserna.

    Download full text (pdf)
    Detaljerad översvämningskarta för Eskilstunaån. Ett projekt inom KRIS-GIS.
1 - 10 of 10
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf